Evanston |
Code of Ordinances |
Code of the City of Evanston, Wyoming |
Chapter 7. Buildings |
Part 7. Storm Water Runoff Control |
Article XV. Review and Approval Procedures |
§ 7-101. Record drawings.
Latest version.
-
A.Submittal and approval. Final record drawings on twenty-four-inch by thirty-six-inch mylar sheets shall be submitted, approved, and signed, or disapproved by the City engineer for all storm sewer improvements to be constructed within a City public street or right-of-way. The reason for disapproval or conditional approval shall be stated in writing within fifteen days of receipt by the City engineer. Final acceptance of the improvements to be maintained by the City will not be given until the required record drawings have been submitted and approved by the City engineer.B.Contents. The record drawings shall contain all as-constructed items pertaining to storm drainage facilities. These record drawings shall be prepared in accordance with the City drawing standards and shall be inked on mylar so as to provide a permanent, reproducible copy of all existing storm water facilities.The record drawing submittals shall also include documentation of the closed conduit and open channel storm sewer facilities by listing pipe diameter, open channel size and dimensions, flow line elevations, and contributing areas. A standard sheet to be used for summarizing this submittal shall also be used.