§ 16-26. Open hole formation testing.  


Latest version.
  • A. 
    All open hole formation testing shall be done during daylight hours, with advance notification thereof made to the oil and gas inspector, adequate to enable him to be present if he so chooses.
    B. 
    All open hole formation testing shall be done into steel tanks, or flared properly in the case of gas.